Space the screws about 12 in 30 cm apart down the entire piece of metal.
How to put on metal roof cap.
Metal roofing ridge cap installation steps center a piece of ridge cap on the building peak.
Metal roofing learning channel.
Put the first piece of ridge cap metal in place.
Step by step instruction on how to install a standing seam metal roof.
See the illustration below.
If there are gutters installed on the eaves the eave flashing should be installed to overhang the lip of the gutter by about 1 2 inch.
Fasten through the high seam of the metal roofing panel.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Fasten the ridge cap with metal to metal fasteners at twelve inch on center.
First we re going to put the hip cap in place and mark it so that we can prepare the end here at the eave and the top at the ridge.
Place corner pieces where panels will meet bends at the edge of the roofing.
In this part i cover installing vented foam closures and the rid.
We cover all the basics of metal roof installation.
Make a mark at the cap s lower edges both sides at one end of the ridge.
Use 1 1 4 inch nails to cover the outline of the roof with strips of metal eave flashing also called edging.
Use your neoprene washer head screws to secure the metal to the sheathing.
Take care the first piece is aligned precisely perpendicular square to the edge.
This closes it off for a nice finished look where the two joints at the eave are.
To make sure you put it in the right place you need to make reference lines.
This is part 6 of a 6 part video series explaining how i installed a metal roof on my house.